Knowledge, Drive, Experience!

Servicing the power generation / heavy industrial markets

GRIP® Inspections

service-icon

GRIP® Level-1

This rotor-in inspection program is designed to fit in a short turbine outage window of 1-2 days (i.e. engine, turbine, or valve borescope inspection).

Details
arrow-icon
service-icon

GRIP® Level-2

This rotor-in inspection program is designed to fit in a 3-4 day turbine outage window (i.e. steam turbine valve inspection, gas turbine combustion inspection, or hot gas path inspection).

Details
arrow-icon
service-icon

GRIP® Level-3

This rotor-out inspection is designed to fit in a Major Inspection turbine outage window (i.e. steam turbine valve, single cylinder inspection, gas turbine hot gas path inspection, or turbine majors).

Details
arrow-icon
service-icon

In situ-GRIP®

This special program is a complete and comprehensive rotor in situ generator assessment. Minimal disassembly of the generator is required; thus, the generator never becomes the critical path of the outage unless an outage is planned specifically to address major maintenance on the generator.

Details
arrow-icon
service-icon

Online-GRIP®

This running condition inspection program is designed for those generators equipped with IRIS-compatible partial discharge couplers and flux probe.

Details
arrow-icon
service-icon

Advanced-GRIP®

We offer many additional advanced-GRIP® services which can be added to any package and enhance your generator assessment.

Details
arrow-icon
View Repair Services

Our Team